PRODUCT CATEGORIES |
|
|
|
|
|
|
|
I'm Online Chat Now |
|
|
|
|
News Center - Wuxi BeiYi Excavator Parts Factory |
|
BEIYI in project of Hong Kong Zhuhai Macao Bridge |
2018/11/8 14:18:45 |
On the morning of October 24, the Hong Kong-Zhuhai-Macao Bridge was officially opened to traffic. The construction of the bridge has condensed the wisdom and hard work of many Jiangsu scientific and technological personnel, and the innovative elements of BeiYi.
Hong Kong-Zhuhai-Macao Bridge
On March 28th, 2017, Hong Kong and Guangdong connected Hong Kong and Macao's key projects - the Honghe Bridge of the Hong Kong-Zhuhai-Macao Bridge West Extension Line was started.
The starting point of Zhuhai Honghe Bridge Project is located in Hongwan, Nanping Town, Xiangzhou District, Zhuhai City. It connects the connecting line of Hong Kong-Zhuhai-Macao Bridge and forms a cross with the Zhuhai Section of Guang'ao Expressway and Hengqin Second Bridge. Hong Wan Chung, along the planned north of the Hongwan Port Area, passes through the reserved channel, turns southwest across the Hongwan waterway, passes through the Hengzhou Island Mangzhou Planning Wetland, crosses the Modaomen Waterway to the Hezhou South Reclamation Area, and ends at Jiangzhu Expressway. The extension line and the Hegang Expressway intersect and the Hezhou South Interchange is established. The route is a bridge with a total length of 9.654 kilometers.
HongHe Bridge
According to the analysis, after the completion of the Honghe Bridge, it will form a real expressway network with the Zhuhai section of the Guang'ao Expressway, the Jinhai Expressway, the Jiangzhu Expressway and the Hegang Expressway, and increase the radiation effect of the Hong Kong-Zhuhai-Macao Bridge extension line on the western part of Guangdong. It will open a large passage between Guangdong and West directly to Hong Kong and Zhuhai.
In the Hengqin Mang Wetland Park, the main tower and pier of the HHTJ2 marked by the Honghe Bridge combines the architectural aesthetics of the bridge with the ecological aesthetics of the wetland park, embellishing a unique and beautiful landscape.
Honghe Bridge construction site
Interior of Honghe Bridge construction site
BeiYi Vibratory Pile Driver
BeiYi Vibratory Pile Driver is lifting a pile
BeiYi Vibratory Pile Driver is trying to driver the pile
BeiYi Vibratory Pile Driver has been installed
Part of the steel sheet piles in the bridge construction process was completed by BeiYi Vibratory Pile Driver. It has two eccentric shafts, which are driven by hydraulic motor to generate high-speed rotation and vertical excitation force. After damping the rubber block, it maintains a certain amplitude and can cope with various types of soil and piling requirements. |
|
|
|
|
|