HOME ABOUT US PRODUCTS NEWS CENTER QUALITY CONTROL CONTACT US REQUEST A QUOTE
PRODUCT CATEGORIES
Piling Equipment
Excavator Attachments
Excavator Spare Parts
  • CE Certificate
  • ISO9001:2008
  • CONTACT US
    BeiYi Excavator Parts Factory
    Shuangmiao Industry Park A,Luoshe Town,Huishan District,Wuxi,Jiangsu,China
    beiyipilebreaker@163.com
    86-0510-85450099
    View Contact Details
    I'm Online Chat Now
    News Center - Wuxi BeiYi Excavator Parts Factory
    Using pile breaker in a construction site in early July 2015
    2019/3/21 16:42:46

    If the bearing capacity of the natural foundation cannot meet the load requirements of the superstructure and cannot be met by simple manual treatment, usually we used pile foundation, the upper load force is transmitted to the depth of the stratum by the pile body to meet the requirements of the stratum.


    Bored pile refers to a pile made by drilling a pile hole with a drilling machine and pouring concrete in the hole (or hoisting a steel cage first in the hole). The bored pile construction technology is a concrete technology with low construction cost, easily operation, no vibration, noise and squeezing effect. At present, this construction technology of bored piles has been widely applied to the field of construction engineering.


    Bored piles generally extend 1 or 2 meters above the ground during the process, so that the steel bars are completely retained on the ground. The pile breaking machine is used to break the bored piles.


    At the beginning of July 2015, in a construction site a 800-1000mm cast-in-place pile, which was about 2 meters high needed to be broken. The construction team abandoned old manual breaking method and used hydraulic pile breaker.This is photos of BeiYi pile breaker in construction site

     

     

    BeiYi hydraulic pile breaker had been Installed

     

     

    Entering the construction site

     

    In the process, an excavator was used to hoist the pile driver, also as a power source providing driving power.

     

    Began to work

     

     

    Pile breaking machine broke piles

      

    The pile breaker was hoisted by the excavator, excavator was used as a moving vehicle. The pile breaker was put into pile body by staff. When cutting the first section, it was cut at a distance of about 400 mm from the upper end surface of the pile. Cutting off every distance no more than 300mm. In the last paragraph, removed the crushed concrete which had fallen around the pile and then align it with the elevation line for the last time. 


    After cutting, a staff removed the broken concrete and used tools to level the surface of the cast-in-place pile.

       
    Contact Details
    BeiYi Excavator Parts Factory
    Shuangmiao Industry Park A,Luoshe Town,Huishan District,Wuxi,Jiangsu,China
    beiyipilebreaker@163.com
    86-0510-85450099
    View Contact Details
    From: Enter your Email ID please.
    Send your inquiry directly to us
      (0 / 3000)
    Excavator Attachments
    BYD 45S/68S Hydraulic Breakers-excavator hydraulic hammer
    BYD 75S/85S Hydraulic Breakers-hydraulic hammers
    BYD 100S/135S Hydraulic Breakers-concrete demolition
    BYD 140S/150S Hydraulic Breakers-pile breaking
    Piling Equipment
    Mini excavator
    BYPM300LS-200*500mm H-beam pile extractor-H beam pile extractor
    BY-PB600LQ Even wall hydraulic pile breaker-Hydraulic pile breaker
    BY-VH250 Vibratory pile driver-excavator mounted vibro hammer
    Excavator Spare Parts
    Cylinder Assembly Excavator Spring Assy
    Excavator Recoil Spring Assy for Multiple Vehicle
    Cylinder Assembly Parts Excavator Tension Spring
    Hquality Recoil Spring Assy Heavy Duty Torsion Spring
    Request A Quote
    Shuangmiao Industry Park A,Luoshe Town,Huishan District,Wuxi,Jiangsu,China
    beiyipilebreaker@163.com
    86-0510-85450099
                   
     

    Copyright © 2019 无锡市北奕挖掘机配件制造厂 版权所有

    苏ICP备12079341号-1


    TEL : 86-0510-85450099   E-mail : beiyipilebreaker@163.com