1.Proprietary team design,patented products,fast moving. 2.One-piece design,lifting as a whole,saving time and labor. 3.700 tons of pulling force,strong pulling,can pull out 32 meters of steel. 4.The oil cylinder is enlarged,the pump station is enlarged,and 40 meters of steel can be pulled out. 5.Double-section oil cylinder,the big cylinder is pulled out,and the small cylinder is accelerated. 6.360° observation by remote control,easy to operate. 7.The hanging plate can be replaced,suitable for steel with different widths from 300mm to 800mm. 8.Machines with a width of 900mm or wider can be customized. 9.Electric power pumping station,environmentally friendly design,easy to operate. 10.The oil cylinder can be moved left and right,easy to solve the pile with dense distance.
Cylinder The double-section high-professional oil cylinder has the function of adjusting the speed,and it can be pulled out more quickly in the large stage of pulling out more quickly in the later stage of pulling out,saving more time.
Hanging board Replaceable hanging plate,can match 300mm-800mm steel with different widths.
Hydraulic station Equipped with a hydraulic station,the power can be adjusted,and the remote operation is safe and convenient.
Support customization Choose what you need
In order to solve the pulling and pulling of different pile types,Beiyi Machinery has introduced H-section steel pile pulling machine and PC construction method pile pulling machine,which you can shoose arbitrarily for on-site needs.
Beiyi H-beam pile extractor uses its pile clamp to clamp the pile head,and the hydraulic cylinder forcefully presses the pile clamp to lift it upward for a certain distance,and pulls out the pile section by section.Pull out l-beam or section steel piles in the layer.